Assembly Part-1
1. First check your kit to make sure the contents are
all there:
Fig 1: Main kit contents, plus some of the other
required items:
   
2. Fuselage and Tail Panels
You can safely ignore the manual, where it recommends cutting the control snakes
and tubes, as it seems this was already done, at least in our kit. Next we
install the Elevator and Rudder tubes (sleeves). Make sure these are glued
along their full length to give stiffness to the aircraft. Then feed the
control rods through the tubes. **Note that we don't connect the control
rods to any of their surfaces, simply get them close for now, as we cant set the
"center position" with battery and TX turned on just yet (last few steps).
Note the basic positioning of the ends of each rod/sleeve in Fig. 2
Figure2:
   
Next... Installation of the wing mounts in Assembly Part-2
|